This week on Lively, a change order spikes the cost of the Washington Bridge demolition.
This week on a Lively Experiment, a change order more than doubles the cost of the Washington Bridge replacement. Plus, a look at local political races. And is using AI in school cheating? Moderator Jim Hummel is joined by Republican Strategist Lisa Pelosi, Providence Journal State House reporter Patrick Anderson, and Boston Glober Reporter and Rhode Island Weekly contributor Steph Machado.

October 25, 2024
A Lively Experiment Podcast

Subscribe via: