Overnight Lane Closures Start on Washington Bridge to Install Weight Monitors

Crews will close the right and center lanes on the section of Interstate 195 spanning the Seekonk River Tuesday, Wednesday and Thursday from 9 p.m. to 5 p.m. Lanes will again be closed Sunday Feb. 23, through Thursday, Feb. 27.
Crews will close the right and center lanes on the section of Interstate 195 spanning the Seekonk River Tuesday, Wednesday and Thursday from 9 p.m. to 5 p.m. Lanes will again be closed Sunday Feb. 23, through Thursday, Feb. 27.
David Lawlor
1 min read
Share
Crews will close the right and center lanes on the section of Interstate 195 spanning the Seekonk River Tuesday, Wednesday and Thursday from 9 p.m. to 5 p.m. Lanes will again be closed Sunday Feb. 23, through Thursday, Feb. 27.
Crews will close the right and center lanes on the section of Interstate 195 spanning the Seekonk River Tuesday, Wednesday and Thursday from 9 p.m. to 5 p.m. Lanes will again be closed Sunday Feb. 23, through Thursday, Feb. 27.
David Lawlor
Overnight Lane Closures Start on Washington Bridge to Install Weight Monitors
Copy

The Rhode Island Department of Transportation (RIDOT) plans to start overnight closures of two lanes on the eastbound Washington Bridge on Tuesday to install electrical cables meant to keep tabs on the structural health of the highway.

Crews will close the right and center lanes on the section of Interstate 195 spanning the Seekonk River on Tuesday, Wednesday and Thursday from 9 p.m. to 5 p.m. Lanes will again be closed Sunday, Feb. 23, through Thursday, Feb. 27.

Earlier this month, RIDOT began closing up to two lanes of travel in both directions overnight on Interstate 195 near the main Iway Bridge, also known as the Providence River Bridge. Drivers can expect those closures to continue Tuesday through Thursday nights from 9 p.m. to 5 a.m.

RIDOT paid $2.8 million last May to Swiss-based technology company Kistler to install sensors meant to monitor traffic volumes, vehicle weights and axle loads, vehicle distances, and vehicle classes that cross the bridge.

The eastbound span, constructed in 2008, was converted to take on western traffic days after the state closed the western Washington Bridge in December 2023 when engineers discovered broken anchor rods that put the span at risk of collapse.

State officials say the new weight monitoring system is being placed as a precaution and that the bridge can handle the additional traffic until a new highway is built.

The state plans to award the contract to rebuild the westbound bridge by June 6, 2025.

This article was originally published by the Rhode Island Current.

The Department of Education announced that its office of Federal Student Aid will resume collections May 5
Unsustainable fishing, not climate change, has been the biggest threat to ocean biodiversity for decades. Scientists warn that dismantling marine protected areas could accelerate the crisis for species, ecosystems, and coastal economies alike
Union says incidents of violence against staff have risen 41% between 2022 and 2024
The measure, introduced by Sen. Sheldon Whitehouse and Rep. Seth Magaziner, is unlikely to succeed in the Republican-controlled Congress
Barrier was built without permission along less sensitive water around same time as Quidnessett Country Club’s controversial wall
Local Catholics reflect on the death of Pope Francis and the legacy he leaves behind here in Rhode Island
Invasive sea squirts are crowding out native species and clogging fishing gear, leaving scientists scrambling to track their spread
Brown and the Library’s mission is to ‘serve the community, the nation and the world by discovering, communicating and preserving knowledge and understanding in a spirit of free inquiry’
Livestream: The Public's Radio

Livestream: The Public's Radio